Brisa, one of the most important production bases of Bridgestone Corporation worldwide, has chosen the ESO Group for the machine assembly of its new plant established in Aksaray sprawling across an area of 950,000 m².
Completed with a team of engineers specializing in turnkey factory assembly, we have been able to provide a complete line of products including a Mixer Line, Textile Calendar Line, Calendar Coating, Auto Carbon Transfer Unit, Automatic Chemical Weighing Unit, Belt Production Machine, Extruder Line, Cutting Machines, Toe Manufacturing Machines, Finished Rubber Control Machines , Shearing Machines and Test machines, all assembled and delivered on time. Brisa’s total production capacity will have increased by 30%, which will be producing 4.2 million tires with the completion of the giant project.
The ESO Group is proud of being the solution partner of Brisa, always maintaining maximum quality of service, being fully aware of the impact continuous and error-free mass production and effective time and stock management have on factory costs and ultimate customer satisfaction.
Click for the references